The Julius Nyerere 2115 MW Hydropower Project - Tanzania 

On the waters of the Rufiji river, in joint venture with The Arab Contractors of Egypt (Osman A. Osman & Co.), ELSEWEDY ELECTRIC is entrusted by the people and government of Tanzania to execute, The Julius Nyerere Hydropower Project. This national mega project that would secure clean power supply to more than 60 million Tanzanians.
  • US $2.9 billion contract
  • 6,307 GWh annual generation
36 months from start to completion
EPC scope of works that includes the main dam, saddle dam, coffer dams, diversion tunnels, stop logs & gates, trash racks, admin building, workshop building, colony, intake structure, power house, cranes, spillways, roads, Rufiji bridge, control building, switchyard, surge tanks, hydro turbines with auxiliaries, generators with auxiliaries, main control valves, power tunnels, transmission lines and firefighting system.
Social projects worth over US $116million

They are looking for the following positions 

A. CARPENTER (MAFUNDI SEREMALA) - NAFASI 100

B.STEEL FIXER (FUNDI CHUMA) - NAFASI 100

C. SCAFFOLDER (FUNDI MAJUKWAA) - NAFASI 50

D. PIPE FITTER (FUNDI BOMBA KUBWA) - NAFASI 20

E. GTAW WELDER - NAFASI 10

F. SMAW WELDER - NAFASI 10

Application Procedures 

Click Link below to download PDF FILE for more details on how to Apply 

No comments

Powered by Blogger.